Writing Shippable Code (Part Two) |
|
|
|
|
Written by Sean Sheehan
|
|
Sunday, 05 October 2008 |
The first part of this
article introduced the concept that developing a complex software system
was like going on a journey. I contrasted how we plan our journeys through the
use of route planning systems against that of an agile journey which is more
like using a GPS in our car. I also introduced the idea that we only know when
we have reached our journeys end (being completely done) when we have
demonstrated that we have fully satisfied the expectations of the customer, our
criteria for a successful outcome and that we can use this thinking throughout
our project so that each iteration delivers software which can achieve a
successful customer outcome.
In this months article I will explain how
we express the criteria for a successful outcome in the context of our software
system and will uncover a loophole many agile teams overlook. Part three will
then conclude with demonstrating how this can be overcome in our code so that
we can
deliver shippable code. It may help you to read / recap part one as I will
continue where that left off.
I
don't like GPS
Not everyone likes or gets on
with a GPS. This first thing people do after purchasing one is to request a
route they have done thousands of times, they could even do it blindfolded if
it was legal. It works and suggests roads they would have chosen. We do this to
validate whether we will get a successful outcome before we use it anger. But
how will the GPS system compare to the old method? Your
passenger used to call out the various road changes and junctions as they
approached. What role do they now play in your journey? Will they sit back and
enjoy the ride? Maybe they start to suggest alternative directions during the
journey so that you end up switching it off. Our managers begin to feel
redundant like our passengers as they no longer need to chase round asking how
we are getting on, instead our count of passing tests v total tests to pass
does this automatically for them.
Although test code is short term overhead,
longer term it's an essential safety-net ensuring that the journey towards
our destination (shippable code) doesn't end up leaving a trail of debris
(defects). Having the test code accelerates our productivity by allowing us to
deliver more functionality than previously since we have increased knowledge of
what is and what is not working. Management have spent many years
delivering and testing products the old way, they often see no value
in the new and will attempt to steer any agile transformation (especially
automated testing) back to their old comfortable way just like our redundant
passengers.
The hitchhiker
Agile development has for some time been heralded as the new new way
to develop software. The agile manifesto itself encourages a different way of
thinking about how we go about delivering code. There are extremists though who
in many ways go even further and hitchhike their way through
development. Only looking at where they are now without regard to where
they need to get to next. They jump on the next iteration to take them a
little way in the direction they are heading and continue doing this until they
reach their destination. There are often several unknowns to this way of
travelling; projected journey time, estimated journey costs and level of
completeness throughout the journey. Though for some journeys this means of
travelling is quite acceptable.
However, after each iteration,
they reflect on where they are, making directional adjustments to ensure they
will reach their destination. Sometimes even backtracking when taken down the
wrong road. They only design the area of the code they need and only focus on
what is currently known adapting this as their knowledge increases. If we
coupled this thinking with knowing our criteria for a successful outcome
(testing our assumptions as we go) we would have much higher confidence in
that we have only produced (code) what was actually needed and that
it does meets our customer's expectations. Maybe we need to give our
hitchhikers a GPS "At
the next interchange, flag down the sliver lorry who will take you 4 miles
southbound, depart there and collect the red truck heading north. Your total
estimated journey time is two hours."
Successful
Customer Outcomes
For us to effectively test our
assumptions as we go we need to understand how we determine what a successful
outcome is and how we can begin to express this. All processes have a criterion
for a successful outcome and the judge for this is neither us nor our customer,
but the end customer, the individual who is going to use our software. As an
end customer I have an expectation of what the system is going to provide for
me. If it does not meet my expectations then we do not have a successful
outcome. If it does, I'm happy and we do have a successful outcome. This simple
view is often missed by most development teams and often lost in translation
when applied to software development in general.
If we have been commissioned to develop a
system for another company who themselves have customers or have a marketing /
product planning division who speak on behalf of our customers, our viewpoint
on "value to the customer" is somewhat different to the end customers. We
end up neglecting the real customer and fail to consider how our system will
perform in their eyes.
Comparing our criteria for success (as developers) against the end customer's we
generally get two different viewpoints. We find it difficult to see through the
eyes of the end customers leading to these differences. However, we spend most
of our lives being end customers to other people's systems. So why is it so
hard for us? Especially when we are quick to complain if a system we
interact with doesn't do what we expected. We forget that each time we interact
with a system one of two things can happen. Firstly, everything goes well
and we are happy, we might not even notice that we have interacted with anything
because things went so smoothly. Secondly, it could go wrong or not
quite as we had expected. We have witnessed a failure point and this taints our
perception of the overall system. As we continue interacting with the
system our feelings snowball when we discover more and more of these. How many
times have you dealt with a system which come the end of your encounter you vow
never to return? This could be a shopping website, a mobile phone,
software on your PC or even a utility / insurance provider.
As we define systems with more
and more end customer interaction we increase our potential to displease.
Minimising the quantity of these interactions is one approach in reducing this
risk, another is to ensure that for each interaction we have viewed our system
as if we were the end customer, considered what the criteria for
successful outcomes are, and understood the impacts of not achieving these.
Remembering that to do this we have to put on our end customers glasses and see through their
eyes.
Touch
points
All software attempts to
encapsulate a process for our end customers. It could be the process of finding
and booking a holiday, purchasing something online, printing off a document or even
taking a photograph on our digital camera. These all are driven by software
following a process to give us what we need. Each time we interact with this
process we have a touch point. We have touched the process.
To illustrate this let's take a
photo with a regular digital camera: -
1. Switch Camera on
2. Set Camera mode to automatic
3. Locate subject in view finder
4. Zoom in/out as required
5. Press the Shutter button
6. View the picture on the
internal LCD
7. Switch the camera off
How many touch points are there? The
answer is seven. Every step we are doing something and our expectation is that
they are all going to do exactly as we ask. It is possible to simplify our
process by reducing the number of touch points, making it easier for our end customer
to use. Most digital cameras for example, combine the first two steps into
one eliminating one touch point. Although, reducing too many touch points can
leave you with a system that is not usable.
Touch points do not have to be
human interactions. They could also be interactions with other systems.
For these, expectations for successful outcomes are more clearly defined
as there usually is a published interface detailing precisely what is being
expected.
Moments of Truth
Our expectation is that every
step in our process is going to do exactly as we ask. But what if it doesn't?
What if you cannot get past step one? How do you feel? For our camera
example it could be the battery, so we change the battery. What if any of
the other steps fail to perform as expected? This is the moment of truth, the
moment at which the system could start failing in our eyes. We have asked the system to do
something and if it doesn't we are not happy. It only takes one failing moment
of truth in any system to leave a bad taste in our mouths. Every other step in
the process could work beautifully, but we have been hurt by the one which
didn't.
This is where we tend to
introduce the majority of our defects in our system by making incorrect assumptions
about what we think is a successful customer outcome. Then failing to test our
assumptions as part of the way we develop software. We write user stories / use
cases with automated unit test but rarely link them together with the
successful end customer outcome. If we did and tested our assumptions as we go
(like our GPS) then we would be able to deliver with confidence, we would
genuinely have shippable code.
Where
are we going?
Knowing our final destination when developing a complex software
system isn't as cut and dry as it is with a GPS or a route plan. For the latter
we know the town or city we are aiming for. Most of the time we even know the
precise address. However, by taking a step back and looking at our software
system as a whole we can capture the overall successful customer outcome we are
aiming at achieving and use this as our clue to our journey's end. We know that
once we have provided a system that meets our end customer's expectations
through successful outcomes we are completely done. You can capture this high
level outcome as your system goal. I recommend that you print this out as large
as you possibly can and post it up all over your offices. Let everyone be
reminded every minute of the day exactly what it is the end customers are
expecting us to do for them.
While this is good for identifying the
overall direction we are travelling, how can we ensure that throughout our
journey we are not deviating away? To help us, we shall look at how we
determine what value to the customer
is.
Lean software principles, in fact lean in
general, categorises steps within our process as value, waste or apparently necessary waste. Assessing
whether a customer would willingly pay for a process step allows us to assign
the appropriate category. We can apply the same thinking against the underlying
software process encapsulated within our system. We use apparently necessary waste as a marker for those aspects of our
process that the customer would not willingly pay for but is still a business
requirement, or seemingly adds value to the business.
Whist I agree to these definitions, they
do not go far enough for me. They allow us to have steps in our process that we
think the customer would willingly pay for, but do not actually contribute towards
a successful outcome for the end customer. In fact what this manages to do
quite well is increase our risk of failure. What if it is this part of our
system which is failing in the end customer's eyes? They are not going to be
impressed despite how good the rest of our system is. This is the loophole with
lean software and agile thinking which leads to us developing systems that have
a significantly higher degree of risk of failing. This is where the majority of
defects in our system arise. A classic example of this is a feature of our
software which when delivered achieves the marketing intent of the feature, but
in the hands of the end customer doesn't make intuitive sense. The end output
is correct, but the steps taken to get there are so convoluted that the end
user gets frustrated near to the point of giving up. Certain Ajax
implementations on the web fall into this trap by trying to be too jazzy with
Ajax without considering the end customer's expected outcome. If it had been
considered carefully then only areas where it was necessary would use Ajax, all
the rest is wasteful.
To overcome this loophole, I would clarify
the lean definitions for value and waste as follows:
Value
Something that not only the end customer is
willing to pay for, but also contributes positively towards their successful
outcome.
Waste
a) Something that the end customer
is not willing to pay for.
b) Something that the customer is willing to pay for, but does not
contribute positively towards the end customer's successful outcome.
For example, I would be willing to pay for a data entry screen on a
holiday booking system to enable a search that matches my holiday criteria.
However each time I change my holiday criteria I have to key in all the
information again. My expected outcome is a confirmed holiday booking, having
to re-enter all my information time and time again only leads to me getting
frustrated with the system eventually to the point that I might give up and
look for another supplier.
With these definitions in mind
we can assess our understanding of our system (new or existing) to determine the
impact of the touch points and moments of truths we have, and how we can
mitigate them to ensure positive successful outcomes. Using positive successful
outcomes as both our unit of distance through our journey and our criteria for
completely done we can begin to show (like our GPS system) precisely how far we
have travelled and precisely how far we have left to go.
The final part of this article will
continue this theme and conclude with how through our code we can close this
loophole so that we can deliver shippable code with confidence.
About the Author
Sean Sheehan is a lean software transformation
manager for a leading embedded control systems company which he has been with
for nearly 10 years. A master black belt candidate for software design for lean six
sigma, certified lean six sigma black belt and certified ScrumMaster with over
20 years software development experience in embedded c++. Sean is currently
assisting lean software / agile transformation within his current division
helping transform three groups from different time zones in applying these
techniques collectively. You may link with him at http://www.linkedin.com/in/spjsheehan.